Live event run order
The layout we use in the gallery. Download it as a CSV (opens in Excel or Google Sheets), then read how to write one properly.
| # | Time | Dur | Item | Source | Audio | Graphics | On | Notes |
|---|---|---|---|---|---|---|---|---|
| 1 | 08:00 | 60 | Crew call, tech run | All | All routes | Load pack | Crew | Test stream to private |
| 2 | 09:30 | 30 | Holding loop live, line checks | Holding | Music bed | Countdown | Remote speakers | Green room |
| 3 | 10:00 | 0:10 | Opening sting | Playback | Embedded | Sting | — | Mics down |
| 4 | 10:00 | 3 | Welcome | Cam 1 | Lav 1 | LT: Host | Host | Address lens |
| 5 | 10:03 | 20 | CEO keynote | Cam 2 / slides | Lav 2 | LT: CEO, slides | CEO | Prompter · FIXED |
| 6 | 10:23 | 2 | Poll 1 launch | Cam 1 | Lav 1 | Poll overlay | Host | 90s window |
| 7 | 10:25 | 15 | Remote panel | Call 1–3 | Callers, mix-minus | LTs ×3 | Panel | Flexible −5 |
| 8 | 10:40 | 10 | Q&A | Cam 1 + Q graphic | Lav 1 | Question straps | Host, moderator | Buffer |
| 9 | 10:50 | 1 | Close & next steps | Cam 1 | Lav 1 | Closing slide | Host | — |
| 10 | 10:51 | ( | Stream stop, save recordings | ), | — | — | Crew | Confirm ISO saved |
Technical specification for venues and suppliers
Send this to the venue and any AV supplier eight weeks out. If every line has an answer, show day is calm.
Connectivity
- Wired Ethernet at gallery position; sustained upload ___ Mbps (tested date ___)
- Dedicated VLAN / separate from guest Wi-Fi: Y / N
- Outbound ports open: 1935 (RTMP), 443, SRT/UDP range ___
- Bonded cellular tested in room: Y / N, signal ___
Audio
- Audio split: per-mic / clean mix, connector ___, pre/post fader
- Stream mix engineer position and desk
- Mix-minus returns for remote contributors: ___
- Radio mic frequencies and battery plan
Vision
- Cameras (number, positions, manned/robotic) ___
- Clean slide feed to gallery: source ___
- Room screen feeds vs stream programme: separate? Y / N
- LED / screen refresh rate and brightness for camera ___
Power & space
- Gallery position (m²), power circuits, UPS on critical kit
- Cable routes and load-in times
People
- Single technical point of contact: ___
- Venue AV lead: ___ · Platform lead: ___ · Streaming lead: ___
- Rehearsal window: ___
Post-event report structure
The one-page-then-evidence structure from our report guide, with the metrics table pre-built.
Page 1: Summary
Objective · Result vs target · What worked (3) · What didn't (3) · Recommendation and decisions needed
Results against targets
| Metric | Target | Actual | Last event |
|---|---|---|---|
| Registered / attended / rate | |||
| Peak concurrent | |||
| Average watch time | |||
| Completion % | |||
| Questions per 100 attendees | |||
| Poll response rate | |||
| On-demand views (30 days) | |||
| Outcome metric (leads / pulse / completions) |
Attendance curve
Concurrent viewers over time, annotated with the run order.